Diagnosis You want to allocate the BOM for material &V1& to an additional plant.This is not possible, as there is only a material master for thismaterial in plant &V2&. Procedure Before you can allocate a material to the same BOM in different plants,the following requirements must be met:
- The material whose BOM you want to allocate to an additional plant must
have a material master in the plant concerned.
- All component materials of the BOM must also have a material master in
the new plant.
|