Diagnosis You want to allocate a material component to the selected operation.This is only possible if the BOM has a status for which the indicatorReleased for work scheduling> is set in Customizing (BOM status). The BOM you want to allocate to the operation has status &V1&. Theindicator is not defined for this status.Procedure You cannot allocate the operation to this BOM until:
- this BOM is given a status with the indicator Released for work
scheduling>
- the settings in Customizing (BOM status) are change to include this
indicator for the selected status
|