Diagnosis You want to allocate a material component to an operation in a routing.This is only possible if the BOM has a status for which the indicatorReleased for work scheduling> is set in Customizing (BOM status). The BOM you are editing does not have a status with this indicator.Procedure You cannot allocate the material component to a routing until:
- the BOM is given a status with the indicator Released for work
scheduling>
- the settings in Customizing (BOM status) are changed to include this
indicator for the selected status
|