Diagnosis You want to change or display BOM group &V1& for material &V2& in plantV3 and have entered date v4 in field fvalid from>. You cannot change/display the BOM, as the BOM is not valid on thisdate.Procedure If you want to display the BOM group in its maximum validity period,proceed as follows:
- Choose BOM group -> Display>.
- Enter the special character "!" at the beginning of the fields
Valid from> and Valid to>. You see a summarized BOM of the BOM group. On the alternative overivew, you see an overview of the validity periodof the individual BOMs in this BOM group.
|