Diagnosis You want to change or display a BOM and have entered both a changenumber and a revision level. The revision level is an additional identifier for the change status ofa material with reference to a particular change number.
- If you enter a change number, the system determines the
valid-from> date from the relevant change master record.
- In this case, the system ignores the revision level, even if the change
number and the revision level do not refer to the same change status ofa material.Procedure If you confirm this warning message, you see the item overview.
|