SAP Message 1N096 - Report for posting planned item is locked, execution failed

Diagnosis
The report is locked to prevent it from posting the planned items thatare being processed by another report.
The reports that might have locked this report are as follows:

  • Report for Currency Changeover of Planned Items (F9PICC)

  • The current report is already running.
  • Procedure
    Wait until the report has finished and start this report again.