SAP Message >2265 - Line item &1 &2 cannot be included in promise to pay


trados = fi

Diagnosis
The line item belongs to the higher level document &V3&. The higherlevel document is

  • A collective bill

  • A bundle

  • An installment plan

  • Simultaneous assignment to a promise to pay and a higher level documentis not possible.

    System Response
    Error message

    Procedure
    Correct the selection of the items to be included in the promise to pay.