SAP Messages

Id Title
6P069 Error building XPBPT
6P070 Entry not possible due to missing/incorrect fiscal year variant
6P071 Data with periods or planning calendar not postponed
6P072 The materials have different posting periods
6P073 No schedule lines exist for the reference
6P074 No reference could be determined
6P075 No further items exist for display
6P076 First item reached
6P077 Material & is marked for deletion
6P078 Not possible to maintain individual quantities when total quantity = 0
6P079 For the change number, schedule lines need to be maintained for & & & &
6P080 Please enter a change number
6P081 Changes on & only allowed with change number &
6P082 MRP area & is not defined
6P083 No plant is assigned to MRP area &
6P084 Please enter plant or MRP area
6P085 Fiscal year variant and period indicator could not be determined
6P086 No suitable requirement for time period & - & selected
6P087 There are no work days in the specified planning period
6P100 System error in the module pool & module &
6P104 Transfer of data not permitted in display mode.
6P105 No data can be transferred after a change of period
6P106 Active indicator & is invalid.
6P107 Strategy group & requires an exact lot size
6P108 Strategy group & does not allow a rounding value
6P116 The forecast period could not be determined
6P118 Please maintain periods & & in Table T009
6P119 Please maintain factory calendar in Table T001W
6P123 Error determining planning periods for calendar &
6P124 Maintain the planning periods for calendar &
6P140 *****COMMENT: Messate for XXL/EXCEL interface
6P141 Schedule lines in the past were ignored
6P142 The period of examination contains more than 100 schedule line dates
6P143 Planning with several BOM expl.numbers indicated with BOM expl.number "*"
6P144 Planning with several production versions indicated with prod.version "*"
6P145 File for list object could not be opened !
6P146 List object could not be recorded in the file !
6P147 XXL has not been installed correctly !
6P148 Presentation server does not run under MS Windows!
6P149 Unexpected error &
6P150 The export of the list object was terminated by another user!
6P151 Error calculating the period of adjustment for planning
6P301 Number range for object &: interval not found
6P302 No internal number assignment for object & number range allowed
6P303 Number range is not defined for object &
6P304 Number of requested numbers must be greater than 1
6P305 Number range is full for object &
6P311 Requirement saved
6P322 Incorrect index structure in Table &
6P323 Select one or more items
6P325 System error: index not found when reading (&)
6P331 Item & does not exist
6P336 Schedule line already exists, after "enter" current quantity valid
6P337 Schedule line already exists, quantity will be added after confirmation
6P338 Item & already exists, entry will be ignored
6P341 Please select desired schedule line
6P342 Please select a schedule line
6P343 Select at least one line
6P344 Please select an item
6P345 Choose one schedule line only
6P357 System: item & is in the workarea for schedule line &
6P360 Configuration for material & not possible
6P362 No items exist
6P363 The date & is not convertible (please correct)
6P364 & date lies before start of factory calendar. (Please correct)
6P365 & date comes after end of valid factory calendar. (Please correct)
6P366 Invalid factory calendar or error in the factory calendar &
6P367 & is not a workday
6P368 Period indicator & cannot be converted
6P369 The fiscal year variant is not maintained in the material master record
6P370 Requirements number & is reserved for individual project planning
6P371 Requirements number & reserved for single-item planning
6P372 Enter info structure and key figure.
6P373 Requirements number & is reserved for internal number assignment
6P374 Requirement already exists with material no. & version & MRP area &
6P375 Planned independent requirement can only be maintained via the network
6P376 Requirement tracking number & already exists
6P377 Requirement number & not within external number range
6P380 Only stock requirements are allowed when planning at MRP area level
6P426 Reference copied for material &, version &
6P427 Item is not suitable for the schedule line (program error)
6P428 From requirements date is greater than to requirements date
6P429 Requirements date indicator smaller than splitting indicator
6P430 Material & & does not exist
6P431 Reqmts with material number &, version &, plant & already exists
6P432 Requirements date indicator equals splitting indicator
6P433 Planning period should lie in the future
6P434 Date will be displaced to the next earlier workday &
6P435 Quantity entered already in the specified period will be deleted
6P436 Splitting period requires the entry of a requirements date to
6P437 Splitting period requires the entry of a splitting indicator
6P438 You must enter a requirements date
6P439 Displacement only possible with monthly/weekly split
6P440 Select the end of the block
6P441 No forecast values exist for material &
6P442 Please enter valid version
6P443 At least one active version already exists in the data base
6P444 No forecast parameters maintained for material &
6P445 Copying the forecast is not allowed with this MRP type
6P446 Requirements date indicator equals splitting indicator
Lines 66301 to 66400 of 607611 entries
1 662 663 664 665 666 6,077