Id | Title |
---|---|
6O008 | Enter the contract start date first |
6O009 | Selected object &1 is not released for account assignment |
6O010 | Only creating is allowed for data structure &1 |
6O011 | Contract renewal deactivated effective on &1 |
6OI000 | No document being processed |
6OI001 | Link server &1 already running |
6OI002 | File not changed. |
6OI003 | This function is not supported. |
6OI004 | SAP link server not running. |
6OI005 | Please create a document first! |
6OI006 | Error while initializing document factory |
6OI007 | Use a Windows GUI for this program |
6OI008 | No document class selected |
6OI009 | Unknown error |
6OI010 | No document selected |
6OI011 | No word processing program selected |
6OI012 | No supported word processing program installed |
6OI013 | Test |
6OI014 | & |
6OI015 | Use a PlatinGUI for this program |
6OI016 | Error in the Business Document Service (BDS) |
6OI017 | There are no documents that meet the search criteria |
6OI018 | This BDS Operation is not allowed |
6OI019 | An object key could not be determined |
6OI020 | A contract could not be determined |
6OI021 | Enter a role category for the recipient |
6OI022 | The contract does not have any partners with role category & |
6OI023 | No recipient could be determined |
6OI024 | Specified document does not exist |
6OI025 | No partner is assigned to the contract |
6OI026 | Number of assigned objects exceeds size of data structure |
6OI027 | Save your data first |
6P001 | Transaction code & does not exist |
6P002 | Argument & does not exist in Table & |
6P003 | Plant & not defined |
6P004 | Desired qty not equal to split qty, after enter, planned qty valid |
6P005 | Please enter date, quantity and material number |
6P006 | System error: index & not found when reading XPBET |
6P007 | Argument & does not exist in Table & |
6P008 | Requirements type in Tables 450B and 459B must be the same |
6P009 | No requirements were found which correspond to the selection criteria |
6P010 | Please enter either a material number or a reqmts number, or both |
6P011 | Requirement already exists, maintain via change transaction first |
6P012 | Requirement blocked |
6P013 | System locking error |
6P014 | Requirement already exists and can be changed after pressing enter |
6P015 | Please enter requirements date or copy reference data |
6P016 | Requirements type & not allowed with reqmts category & (Table 459K) |
6P017 | No new requirements can be created during a change transaction |
6P018 | Requirement already exists for the entered reqmts type or version |
6P019 | Argument & & is not intended for table & |
6P020 | System error: index & does not exist in internal Table & |
6P021 | Enter a date |
6P022 | You have not entered a period |
6P023 | Please check your entries |
6P024 | When entering a product group, quantity or percent is not allowed |
6P025 | When entering a product group, displacement is not allowed |
6P026 | Sales plan can only be transferred on list entry screen |
6P027 | Production plan can only be transferred on list entry screen |
6P028 | Field selection & does not exist (T450F) |
6P029 | Enter a material number |
6P030 | Requirements type & does not exist |
6P031 | Strategy group has not been maintained |
6P032 | Requirement has been deleted, after ENTER you can recreate it |
6P033 | Reference was directly copied |
6P034 | Specify a plant |
6P035 | Requirements type cannot be changed |
6P036 | Version cannot be changed |
6P037 | Requirement was already available |
6P038 | No reqmts were found, after confirming entries, they will be created |
6P039 | Please enter requirements number |
6P040 | Selected entry combination excludes allocation display |
6P041 | No data was changed |
6P042 | Please enter either a material number or an MRP controller |
6P043 | Please enter an MRP controller |
6P044 | Please enter an operator |
6P045 | Date is not within the planning horizon ( & - & ) |
6P046 | Select a valid period |
6P047 | Only inactive requirements exist |
6P048 | The raster & you selected in invalid |
6P049 | Incorrect combination of interface parameters |
6P050 | Not possible to switch views due to a different calendar. |
6P051 | Reference data outside the planning horizon was not copied. |
6P052 | Not possible to display table because calendar is different. |
6P053 | Errors occurred while reading data, see the message log |
6P054 | Incorrect interface parameters |
6P055 | No data is available for the sales/production plan for material &. |
6P056 | No consumption records exist for material & &. |
6P057 | Error occurred during determination of the consumption records. |
6P058 | Date ( & ) lies outside the planning horizon |
6P059 | Material is locked for modeling |
6P060 | Configuration and period splitting exist |
6P061 | All materials relating to the planning scenario are selected |
6P062 | Entry not possible due to different calendars |
6P063 | No data found for & & & & |
6P064 | Entry not possible due to missing/incorrect calendar |
6P065 | Not possible to display planning table due to different calendars |
6P066 | Not possible to display planning table due to missing calendar |
6P067 | Only & materials are copied per step |
6P068 | Please choose a processing type |