Id | Title |
---|---|
61453 | Enter plant |
61454 | Run schedule header & will be created |
61455 | Run schedule header & does not exist |
61456 | Run schedule header & exists already |
61457 | Run schedule header & will be changed |
61458 | Run schedule header & will be deleted |
61459 | Please select planning object |
6146 | Environment variable 'HOSTNAME' not maintained for your PC |
61460 | Entered line or column greater than maximum value |
61461 | No run schedule header exists for material & & |
61462 | No run schedule header exists for material & & version & |
61463 | Select field |
61464 | In period & the total quantity is short of & |
61465 | In period & the total quantity is exceeded by & |
61466 | Repetitive mfg not allowed for material & & |
61467 | Version for material either does not exist or is blocked |
61468 | Validity period end is smaller than validity period start |
61469 | Validity period end lies after version validity date & |
6147 | Programm & cannot be accessed |
61470 | Validity period start lies brfore version validity date & |
61471 | Enter version |
61472 | RS header & already exists in the schedule run time |
61473 | No run schedule header exists for this selection |
61474 | Not possible to convert to production order |
61475 | Incorrect run schedule header & in planned/production order & |
61476 | Entry & & & missing in T437Z |
61477 | No version entered, sel. ind will be deleted |
61478 | No valid run schedule header exists in this time |
61479 | No assignment possible |
6148 | Please select only one |
61480 | & planned orders cannot be specifically assigned |
61481 | Please enter plnning calendar for freely definable plnng period selection |
61482 | Please select planning period |
61483 | Entry & missing in Table & |
61484 | Assignment not possible. No active version exists for the planning date |
61485 | No element in column & can be confirmed |
61486 | No planned data exists for material &, plant & |
61487 | No planning calendar can be selected |
61488 | Please select only one period split |
61489 | Please select at least one output object |
6149 | Document & does not exist |
61490 | No valid calendar ID was entered |
61491 | No element in column & can be assigned |
61492 | Final delivery has already been made for partial order & |
61493 | No released production order was selected |
61494 | No open reservations exist for production order & |
61495 | Production order & has already been finally confirmed |
61496 | Conversion factor to unit of measure & for material & not maintained |
61497 | Run schedule header & is blocked |
61498 | Run sched. hdr &1 cannot be deleted because run sched. qty still exists |
61499 | Entered version does not appear in the planning table |
6150 | Maintain document type & as data carrier |
61500 | Object & does not exist |
61501 | Number range & for object & does not exist |
61502 | Entered version already exists |
61503 | Enter a version |
61504 | Enter a run schedule header with partial orders |
61505 | No capactiy planning active |
61506 | Assignments were saved |
61507 | Changes were made to master plan |
61508 | Delete not possible: RH header's cost collector has no deletion indicator |
61509 | Please enter a material |
6151 | Status in engineering change mgmt cannot be set as "finished" |
61510 | Invalid object type |
61511 | Number range & for object & not planned for internal allocation |
61512 | Number range not planned for external allocation |
61513 | Number range &1 for object &2 nearly exhausted |
61514 | Number range & for object &2 exhausted |
61515 | Number & does not lie within the provided interval |
61516 | No documentation exists |
61517 | Please maintain repetitive mfg profile in the material master record |
61518 | Entered product group does not exist |
61519 | No costing data exists |
6152 | Document is used & |
61520 | Deletion ind. cannot be set; validity per. of RS header extends in future |
61521 | Deletion indicator will be set; it cannot be reset |
61522 | Please check your entries |
61523 | Please enter valid hierarchy |
61524 | & RS created, & RS changed, & create version, & change version terminated |
61525 | RS header for material &, version & not created. Reason: |
61526 | Not possible to go to line set as you did not access via line set |
61527 | No pegged requirements exist |
61528 | Please enter either RS header or material, version and selection date |
61529 | Runtime of RS header cannot be shortened as much |
6153 | Copy of archive link could not be produced in & |
61530 | Procurement type/special procurement type only available as from 2.0 |
61531 | Please enter either the production or the stock transfer plant |
61532 | The production/stock transfer plant corresponds to the ordering plant |
61533 | Special procurement type & not defined |
61534 | Lot-size indicator for lot-sizing procedure & invalid |
61535 | Invalid entry |
61536 | Plant entry unnecessary for procurement type "&", special proc. "&" |
61537 | Please enter the period length (number of days) |
61538 | Period length was cancelled |
61539 | Please complete table entry |
6154 | Data carrier & already exists |
61540 | Please maintain the range of coverage period |
61541 | Backflush not possible as not a milestone operation |
61542 | No capacity data can be displayed |
61543 | The dates are displayed in ascending order |