| 61453 |
Enter plant |
| 61454 |
Run schedule header & will be created |
| 61455 |
Run schedule header & does not exist |
| 61456 |
Run schedule header & exists already |
| 61457 |
Run schedule header & will be changed |
| 61458 |
Run schedule header & will be deleted |
| 61459 |
Please select planning object |
| 6146 |
Environment variable 'HOSTNAME' not maintained for your PC |
| 61460 |
Entered line or column greater than maximum value |
| 61461 |
No run schedule header exists for material & & |
| 61462 |
No run schedule header exists for material & & version & |
| 61463 |
Select field |
| 61464 |
In period & the total quantity is short of & |
| 61465 |
In period & the total quantity is exceeded by & |
| 61466 |
Repetitive mfg not allowed for material & & |
| 61467 |
Version for material either does not exist or is blocked |
| 61468 |
Validity period end is smaller than validity period start |
| 61469 |
Validity period end lies after version validity date & |
| 6147 |
Programm & cannot be accessed |
| 61470 |
Validity period start lies brfore version validity date & |
| 61471 |
Enter version |
| 61472 |
RS header & already exists in the schedule run time |
| 61473 |
No run schedule header exists for this selection |
| 61474 |
Not possible to convert to production order |
| 61475 |
Incorrect run schedule header & in planned/production order & |
| 61476 |
Entry & & & missing in T437Z |
| 61477 |
No version entered, sel. ind will be deleted |
| 61478 |
No valid run schedule header exists in this time |
| 61479 |
No assignment possible |
| 6148 |
Please select only one |
| 61480 |
& planned orders cannot be specifically assigned |
| 61481 |
Please enter plnning calendar for freely definable plnng period selection |
| 61482 |
Please select planning period |
| 61483 |
Entry & missing in Table & |
| 61484 |
Assignment not possible. No active version exists for the planning date |
| 61485 |
No element in column & can be confirmed |
| 61486 |
No planned data exists for material &, plant & |
| 61487 |
No planning calendar can be selected |
| 61488 |
Please select only one period split |
| 61489 |
Please select at least one output object |
| 6149 |
Document & does not exist |
| 61490 |
No valid calendar ID was entered |
| 61491 |
No element in column & can be assigned |
| 61492 |
Final delivery has already been made for partial order & |
| 61493 |
No released production order was selected |
| 61494 |
No open reservations exist for production order & |
| 61495 |
Production order & has already been finally confirmed |
| 61496 |
Conversion factor to unit of measure & for material & not maintained |
| 61497 |
Run schedule header & is blocked |
| 61498 |
Run sched. hdr &1 cannot be deleted because run sched. qty still exists |
| 61499 |
Entered version does not appear in the planning table |
| 6150 |
Maintain document type & as data carrier |
| 61500 |
Object & does not exist |
| 61501 |
Number range & for object & does not exist |
| 61502 |
Entered version already exists |
| 61503 |
Enter a version |
| 61504 |
Enter a run schedule header with partial orders |
| 61505 |
No capactiy planning active |
| 61506 |
Assignments were saved |
| 61507 |
Changes were made to master plan |
| 61508 |
Delete not possible: RH header's cost collector has no deletion indicator |
| 61509 |
Please enter a material |
| 6151 |
Status in engineering change mgmt cannot be set as "finished" |
| 61510 |
Invalid object type |
| 61511 |
Number range & for object & not planned for internal allocation |
| 61512 |
Number range not planned for external allocation |
| 61513 |
Number range &1 for object &2 nearly exhausted |
| 61514 |
Number range & for object &2 exhausted |
| 61515 |
Number & does not lie within the provided interval |
| 61516 |
No documentation exists |
| 61517 |
Please maintain repetitive mfg profile in the material master record |
| 61518 |
Entered product group does not exist |
| 61519 |
No costing data exists |
| 6152 |
Document is used & |
| 61520 |
Deletion ind. cannot be set; validity per. of RS header extends in future |
| 61521 |
Deletion indicator will be set; it cannot be reset |
| 61522 |
Please check your entries |
| 61523 |
Please enter valid hierarchy |
| 61524 |
& RS created, & RS changed, & create version, & change version terminated |
| 61525 |
RS header for material &, version & not created. Reason: |
| 61526 |
Not possible to go to line set as you did not access via line set |
| 61527 |
No pegged requirements exist |
| 61528 |
Please enter either RS header or material, version and selection date |
| 61529 |
Runtime of RS header cannot be shortened as much |
| 6153 |
Copy of archive link could not be produced in & |
| 61530 |
Procurement type/special procurement type only available as from 2.0 |
| 61531 |
Please enter either the production or the stock transfer plant |
| 61532 |
The production/stock transfer plant corresponds to the ordering plant |
| 61533 |
Special procurement type & not defined |
| 61534 |
Lot-size indicator for lot-sizing procedure & invalid |
| 61535 |
Invalid entry |
| 61536 |
Plant entry unnecessary for procurement type "&", special proc. "&" |
| 61537 |
Please enter the period length (number of days) |
| 61538 |
Period length was cancelled |
| 61539 |
Please complete table entry |
| 6154 |
Data carrier & already exists |
| 61540 |
Please maintain the range of coverage period |
| 61541 |
Backflush not possible as not a milestone operation |
| 61542 |
No capacity data can be displayed |
| 61543 |
The dates are displayed in ascending order |