SAP Messages

Id Title
61162 Please enter a valid period indicator
61163 Please enter a fiscal year variant for period indicator &
61164 Please enter a period split for period indicator &
61165 Please enter a PP planning calendar for period indicator &
61166 Fiscal year variant & does not exist
61167 Period split & does not exist
61168 Fiscal year variant only makes sence for period totals with period &
61169 Planning calendar only makes sence for period totals with period &
6117 New version created
61170 Period split only makes sence for period totals with period &
61171 Graphic profile & & & is not correctly maintained
61172 Invalid date
61173 Selection of planned orders was interrupted after & hits
61174 Period indicator only makes sense for period totals display
61175 Conversion of unit of measure &1 to unit of measure &2 not possible
61176 Date lies outwith the period of examination
61177 No deleted components exist
61178 Distribution function & does not exist in plant &
61179 Enter a material
6118 Original cannot be displayed on this terminal (& type &)
61180 You have not selected any material components
61181 Material component is a planned receipt
61182 The material is only available from & for materials planning
61183 Material requires configured sales order
61184 Sales order is different from planned sales order (& &)
61185 Account assignment type copied from the sales order
61186 Please enter a date that does not lie in the past
61187 Rounding profile does not exist
61188 The purchase requisition has been completely ordered
61189 Reservation has more than 9999 items
6119 Data for application & cannot be put in archive &
61190 The line item & not found in internal Table &
61191 Invalid line in internal Table &
61192 Material & in plant & is available for the requirement date
61193 On the &, only & & available
61194 Material is never available
61195 Entered value not allowed
61196 No planned orders exist for the selection criteria
61197 Error & does not exist
61198 Special procurement & for plant & is not valid
61199 Week is invalid
6120 Document has SAP objects assigned
61200 SQL error: Error in READ (Table: & )
61201 SQL error: Error in the UPDATE (Table: & )
61202 SQL error: Error in the DELETE (Table: & )
61203 SQL error: Error in the SELECT (Table: & )
61204 SQL error: error during INSERT (table: &)
61205 MRP calculation only until the end of the short-term horizon
61206 No. of periods for the end of the short-term horizon set to 1
61207 The validity of the short-term horizon ws not limited
61208 Short and long-term lot-size indicator not compatible
61209 Long-term planning is not active in plant &
6121 Start authorization for application & not set
61210 Planning calendar is blocked. Display only
61211 Sales order &1 &2 is blocked for single-item planning
61212 An order quantity of 0 is not allowed
61213 Material &1 &2 is blocked from planning with scenario &3
61214 Planning run for scenario &1 is plant &2 has already started
61215 Contract uses storage location &
61216 Stge loc. does not correspond to the stge loc. of the scheduling agmt
61217 No documents exist
61218 Materials to be discont.in parallel and follow-up mat.are deactivated
61219 Inserting is not possible in the discontinue/follow-up procedure
6122 Documents exist (indicator cannot be set)
61220 The sum of the usage probabilitites is &
61221 Material's assembly scrap is &
61222 Time interpr.only poss.when using period lot size with planning calendar
61223 Do not maintain time interpretation and scheduling together
61224 Multi-level discontinuation not supported
61225 Conversion between units of measure &1 / &2 for material &3 not possible
61226 Quantity overflow for component & in BOM explosion
61227 Error: non-stock component &1 with in-house production is recursive
61228 Please specify an account assignment type with consumption posting 'U'
61229 Material &1 &2. Status &3 allows no purchase order
6123 Entry with "*" not allowed
61230 Long-term lot size has not yet been completely maintained
61231 Material &1 in plant &2 is blocked for Purchasing
61232 Quantity overflow of material & in net requirements calculation
61233 Error during compression of internal table &
61234 Error during expanding of internal table &
61235 Internal table &1 is not in memory
61236 Transfer end &2 is before transfer start &1.
61237 Planning run executed: &1 materials, &2 with exceptions
61238 Order is not part of the BOM you are currently processing
61239 Purchase requisition can only be deleted by deleting the order.
6124 Not a valid SAP object
61240 Order quantity &1 &3 increased by &2 &3 scrap
61241 The scrap quantity was adjusted proportionally
61242 The order quantity may not be less than the GR quantity.
61243 Partially confirmed planned order &1 cannot be deleted
61244 Account assignment data is incomplete
61245 Invalid date &1 for element &2 &3 &4
61246 Material is locked for purchasing
61247 No vendor (creditor) found for MRP element
61248 No customer (debitor) found for MRP element
61249 Material & does not exist in plant &, MRP area &
6125 Special characters & and & not allowed
61250 Error calculating the period of adjustment for demand management
61251 Purchase requisition &1 has not delivery date
61252 Deletion of & is only allowed in single-level BOM/structure representn
Lines 57701 to 57800 of 607611 entries
1 576 577 578 579 580 6,077