Id | Title |
---|---|
V3302 | Maintain the current CRM release (table CRMPAROLTP) |
V3899 | The copy requirements for operation &1 are not met |
V4001 | No scheduling agreement could be determined |
V4002 | The delivery entered does not exist in the document flow |
V4003 | The delivery date entered does not correspond to the document date |
V4004 | The production go-ahead start time lies after the prod.go-ahead end time |
V4005 | The material go-ahead start time lies after the mat.go-ahead end time |
V4006 | The production go-ahead period is longer than the mat.go-ahead period |
V4007 | The beginning of the val.period of the dlv.sched.lies after its end |
V4008 | The cust.mat.no.in the sched.agreement differs from the one selected |
V4009 | The customer no. in the sched.agreement differs from the one selected |
V4010 | The customer plant in the sched. agreement differs from the one selected |
V4011 | The unloading point in the sched.agreement differs form the one selected |
V4012 | The usage indicator in the sched.agreement differs from the one selected |
V4013 | The PO numbers in the sched. agreement differ from the ones selected |
V4014 | No description was assigned to the usage indicator & |
V4015 | The current cml.delivered quantity is smaller than the cml.received qty |
V4016 | Save your changes first |
V4017 | No deliveries could be determined |
V4018 | The cml.received quantity does not correspond with specified delivery |
V4019 | The cumulative received quantity was reduced without a change of year |
V4020 | The scheduling agreement does not exist |
V4021 | The scheduling agreement item does not exist |
V4022 | The cml.received qty does not correspond with the specified withdrawal |
V4023 | For this function, two delivery schedules must be selected |
V4024 | Select only one SA release for this function |
V4025 | Select one to five SA releases for this function |
V4026 | Invalid function for selection |
V4027 | No schedule lines exist for this SA release |
V4028 | Usage & is not defined |
V4029 | The delivery quantity specified does not correspond with the delivery |
V4030 | Scheduling agreement &1 for IDoc &2 has been processed |
V4031 | The customer for this scheduling agreement does not exist |
V4032 | No record exists in T661W for vendor &1, plant &2, unloading point &3 |
V4033 | No special rule exists in T663A for sold-to party & |
V4034 | No scheduling agreement could be found |
V4035 | No unique scheduling agreement could be determined |
V4036 | No old schedule lines existed to be copied |
V4037 | In table T663A the ID for first run was set for sold-to party & |
V4038 | Unknown delivery number. Check the proposal for the inbound progr. count |
V4039 | Partner number & is unknown |
V4040 | The material go-ahead was reduced |
V4041 | The production go-ahead was reduced |
V4042 | The delivery go-ahead was reduced |
V4043 | Customer material &1 does not exist in scheduling agreement &2 |
V4044 | IDoc no. &1 was not processed up to the final save |
V4045 | Scheduling agreement &1 found during planning was manually set to &2 |
V4046 | In table T663A the dlv.schedule test run ID was set for customer & |
V4047 | In table T663A the JIT test run ID was set for customer & |
V4048 | SA release ID & in the IDoc cannot be processed |
V4049 | Forecast delivery schedule key & in the IDoc cannot be processed |
V4050 | An invalid date exists in IDoc & |
V4051 | An invalid period ID was transferred |
V4052 | An invalid week was determined during IDOC processing |
V4053 | Scheduling agreement &1 &2 with a reason for rejection was found |
V4054 | No text could be inserted in IDoc &1 and scheduling agreement &2 |
V4055 | No text could be saved for IDoc &1 and scheduling agreement &2 |
V4056 | Release no. &2 has already been allowed for in scheduling agreement &1 |
V4057 | IDoc &2 was already planned in scheduling agreement &1 |
V4058 | The old dlv. sched no. &1 in IDoc &2 <> than current delivery sched.no.&3 |
V4059 | An error occurred during CALL TRANSACTION processing |
V4060 | IDoc & could not be opened |
V4061 | Mandatory segment & does not exist in the IDoc |
V4062 | The IDoc segment sequence is incorrect |
V4063 | IDoc number is not known |
V4064 | Error &1 = &2 has been transmitted by the translator |
V4065 | The scheduling agreement determined & has no special stock ID |
V4066 | The delivery entered is not an external agent withdrawal |
V4067 | Generated ESA consignment issue & is incomplete (see incompletion log) |
V4068 | Ext. service agt consignment issue &1 for IDoc &2 has been processed |
V4069 | No external agent delivery was entered as a starting point |
V4070 | Error reading internal table: Contact programmers |
V4071 | Check item &, quantity change exceeds the change tolerance |
V4072 | Dlv.sched. &1 deviates from dlv.sched. &2 on &3 in the timeframe by &4 % |
V4073 | Scheduling agrmt &1, material, customer &2, sold-to party &3, plant &4 |
V4074 | Unloading point &1, usage ID &2, sales org. &3, distribution channel &4 |
V4075 | Division &1, order type &2, completion number &3 |
V4076 | Vendor number &2 has not been saved for customer &1 |
V4077 | More than one item exists in IDoc & |
V4078 | Index VLPKM: found sched.agreement no. & does not exist (VBAK) |
V4079 | Packing material no. changed from &1 in the old IDoc to &2 |
V4080 | The previous IDoc for the packing material check could not be closed |
V4081 | Consider delivery unit &2 &3 in item &1 |
V4082 | Take minimum order quantity &1 &2 into account in item &3 |
V4083 | Item &1: Order quantity smaller than delivery quantity: &2 &3 |
V4084 | Eng.change statuses are either dep. on cml.qties and fiscal year or date |
V4085 | Header text for scheduling agreement & has been copied from IDoc |
V4086 | Item text for scheduling agreement & has been copied from the IDoc |
V4087 | For sold-to party & there is no special rule for ext.agt proc. in T664A |
V4088 | Packing materials have been sent using an ext.agent delivery |
V4089 | The first run ID has been set for sold-to party & in T664A |
V4090 | There is a header text for sales order & in the IDoc |
V4091 | There is an item text for sales order & in the IDoc |
V4092 | The withdrawal quantity specified does not match the withdrawals |
V4093 | Text ID &1 in IDoc &2 is not allowed for order type &3 |
V4094 | The delivery schedule type &1 in IDoc &2 is not allowed |
V4095 | The delivery schedule date lies in the future |
V4096 | Delivery of &2 &3 has already been made for item &1 |
V4097 | Delivery number &1 replaced by internal number &2 |
V4098 | Special rule for self-billing doc. missing for sold-to party & in T665A |