SAP Messages

Id Title
SI058 ****** Reserved for DDIC foreign key ************************************
SI059 ****** Reserved for DDIC foreign key ************************************
SI060 ****** Reserved for DDIC foreign key ************************************
SI061 ****** Reserved for DDIC foreign key ************************************
SI062 ****** Reserved for DDIC foreign key ************************************
SI063 ****** Reserved for DDIC foreign key ************************************
SI064 ****** Reserved for DDIC foreign key ************************************
SI065 ****** Reserved for DDIC foreign key ************************************
SI066 ****** Reserved for DDIC foreign key ************************************
SI067 ****** Reserved for DDIC foreign key ************************************
SI068 ****** Reserved for DDIC foreign key ************************************
SI069 ****** Reserved for DDIC foreign key ************************************
SI070 ****** Reserved for DDIC foreign key ************************************
SI071 ****** Reserved for DDIC foreign key ************************************
SI072 ****** Reserved for DDIC foreign key ************************************
SI073 ****** Reserved for DDIC foreign key ************************************
SI074 ****** Reserved for DDIC foreign key ************************************
SI075 ****** Reserved for DDIC foreign key ************************************
SI076 ****** Reserved for DDIC foreign key ************************************
SI077 ****** Reserved for DDIC foreign key ************************************
SI078 ****** Reserved for DDIC foreign key ************************************
SI079 ****** Reserved for DDIC foreign key ************************************
SI080 At least 1 project must be chosen
SI081 Planned start & is earlier than project start date &
SI082 Planned end date & is later than project end date &
SI083 Planned start & is after project end date &
SI084 Planned end date & is before project start date &
SI085 Activity data deleted
SI086 No list can be displayed for specified criteria
SI087 Degree of processing set to 100; as actual end is maintained
SI088 You have no display authorization for project &
SI089 You only have display authorization for project &
SI090 Table structure & does not exist in language &
SI091 Error in DDIC
SI092 List width exceeds maximum width
SI093 Download terminated
SI094 Actual end reset because degree of processing is less than 100
SI095 You are not authorized to maintain the status of project &
SI096 You are not authorized to analyze project &
SI097 You are not authorized to create notes for project &
SI098 Planned start & is after the higher-level planned end &
SI099 Planned start & is before the higher-level planned start &
SI100 Please enter a file name
SI101 The specified path name does not exist. Please check
SI102 Upload only works for standard unit days
SI103 Planned end & is after the higher-level planned end &
SI104 Planned end & is before the higher-level planned start &
SI105 Degree of processing set to 100 as status set to &
SI106 Remaining expense was reset; check actual expense
SI107 The specified view does not exist. Please check
SI108 No view can be generated of the procedure model activities
SI109 Incorrect problem number entered
SI110 Select a problem message
SI111 &
SI112 Date format invalid for upload
SI113 Planned resources adjusted
SI114 Values entered do not match dependent values
SI115 Data is blocked by user &1 and could not be saved
SI116 Percentage complet and resources used have been calculated
SI117 Status maintenance is currently locked by user &
SI118 Use a valid valuation for this status
SI119 Actual resources recalculated
SI120 There is no planning data to be inherited
SI121 Select at least one planned value
SI122 Select at least one resource
SI123 Select at least one keyword
SI124 Data was successfully inherited
SI125 No data passed on
SI130 Describe the error in a message
SI131 Status not defined (TIMG3, TIMG4)
SI132 Error printing
SI133 Print completed
SI140 Specify a resource
SI141 Specify at leat one status
SI142 From entry must be larger than/equal to Actual entry
SI143 Please specify a value
SI144 Incorrect sequence of planned start deadlines
SI145 Incorrect sequence of planned end deadlines
SI146 Incorrect sequence of planned time
SI147 Incorrect sequence of actual start deadlines
SI148 Incorrect sequence of actual deadlines
SI149 Incorrect sequence of actual time
SI200 & not found for 'Created by' in the specified projects
SI201 & not found for 'Changed by' in the specified projects
SI202 'From' expenditure is greater than 'To' expenditure
SI203 You have entered project & more than once
SI204 You have entered status & more than once
SI205 Status & is not contained in the projects specified
SI206 The selection field & is not contained in the projects specified
SI207 The resource & is not contained in the projects specified
SI208 Note type & does not exist in the projects specified
SI209 You have entered project doc. type & more than once
SI210 Value specified and flag 'not maintained' are mutually exclusive
SI211 You have entered resource & more than once
SI212 You have entered selection field & more than once
SI213 'From' degree of processing is greater than 'To' degree of processing
SI214 'From' date is later than 'To' date
SI215 Specify a 'from' date which is not later than the 'to' date
SI216 The view & does not exist in the specified projects
SI217 You have entered View & more than once
Lines 513301 to 513400 of 607611 entries