| RM724 |
Communication or system error when receiving the message |
| RM725 |
Program error in function module & |
| RM726 |
Processing of the backflush was terminated |
| RM727 |
Inspection lot cannot be created for an expired production version |
| RM728 |
In the current scenario, partial processes are posted immediately |
| RM729 |
Partial proc. posted immediately when conf. sales order w/o cost coll. |
| RM730 |
In case of confirmation w. 'Correction', subprocesses posted immediately |
| RM731 |
In case of conf. w. 'doc-neutr. cancell.', subprocesses are posted immed. |
| RM732 |
In case of RP conf. for planned order, subprocesses are posted immmed. |
| RM733 |
In case of conf. for production lot, subprocesses are posted immediately |
| RM734 |
In case of final conf. w. qties on line, subprocesses are posted immed. |
| RM735 |
Error reading Customizing entry for LIS |
| RM736 |
No planned order found for document log number & |
| RM737 |
No planned order found for key 'plnum = &' |
| RM738 |
GR quantity for confirmation & > total GR quantity for planned order & |
| RM739 |
The partial processes are posted immediately for component scrap |
| RM740 |
Diff. search strategies for diff. production strategies not allowed |
| RM741 |
No reporting points allowed for make-to-order REM |
| RM745 |
Cost estimate with costing date in the past not allowed |
| RM749 |
Collective mess. for mat. & in plant & with version & not executed on & |
| RM750 |
Collective confirmation carried out for mat. & in plant & with version & |
| RM751 |
Material document & was posted |
| RM752 |
Activity document & & was posted |
| RM753 |
Reporting point document & was posted |
| RM754 |
Backlog single document & was posted |
| RM755 |
If the cumulative record is changed, all individual records are adjusted |
| RM756 |
No quantity change allowed if individual postprocessing records |
| RM757 |
Inconsistencies exist in the postprocessing records of material & |
| RM758 |
Documents were created |
| RM759 |
Numbering of "RSPOS" carried out for "RSNUM" = & |
| RM760 |
No matching user with name & found |
| RM761 |
User &1 does not have RFC authorization |
| RM762 |
Separate aggregation of goods issues and activities not possible |
| RM763 |
Unit of measure in routing header changed. Costing not possible |
| RM764 |
At least one item was not deleted due to non-cumulated backlogs |
| RM765 |
Item cannot be deleted (non-cumulated backlogs) |
| RM769 |
You are not allowed to change partially confirmed planned order &1 |
| RM770 |
Cancellation not poss. because decoupled conf. already post-executed |
| RM771 |
Cancellation not possible because RP document &1 not cancellable |
| RM780 |
Parallelization type of confirmation processes not yet defined |
| RM781 |
vvvvvvvvvvv Error messages for 4.6A |
| RM782 |
Enter a quantity |
| RM783 |
Enter either sales order, planned order or material |
| RM784 |
Detailed settings not possible in case of activity confirmation |
| RM785 |
User wants to limit selection further |
| RM786 |
Incorrect authorization profile for authorization object &1 |
| RM787 |
No authorization for: &1 in plant &2, storage location &3 |
| RM788 |
Material number or planned order required |
| RM790 |
Only "scrap confirmation at reporting point" possible |
| RM791 |
Reporting point & was deleted: Document can no longer be cancelled |
| RM792 |
Confirmation type reset to assembly confirmation |
| RM793 |
Switched to "Propose all components" |
| RM794 |
Switched to "Propose all operations" |
| RM795 |
Sales order copied from the planned order |
| RM796 |
Cancelled by user |
| RM797 |
Entry variant no longer exists |
| RM799 |
***** From here: messages for actual confirmation of activities ******** |
| RM800 |
First operation is already reached |
| RM801 |
Last operation is already reached |
| RM810 |
Error during unit conversion |
| RM811 |
When calculating differences, actual activity must be > target activity |
| RM812 |
Activity type in row & for cost center & not allowed |
| RM813 |
Selected row is already an excess activity row |
| RM814 |
Target activity is 0. No differences will be calculated |
| RM815 |
No row was selected |
| RM816 |
In row &, no activity unit has been specified |
| RM817 |
Not all rows could be deleted |
| RM818 |
Work center & does not exist in plant & |
| RM819 |
You have not selected an operation |
| RM820 |
Reference qty zero (Target confirmation of all operations not possible) |
| RM821 |
No activity type has been specified in row & |
| RM822 |
Confirmation data set to target value of new work center |
| RM823 |
No rows will be deleted |
| RM824 |
No operation requiring confirmation exists in the routing |
| RM825 |
You must have maint. at least one standard value parameter per operation |
| RM826 |
A maximum of six activity parameters possible |
| RM827 |
No activities posted |
| RM828 |
Error in actual cost calculation |
| RM829 |
Postprocessing record with weblnr = & was not locked |
| RM830 |
If you change quantity 0, dummy components are not adjusted |
| RM831 |
Activity posting document & & no longer exists |
| RM832 |
Cost collector & blocked |
| RM840 |
No entering of rework when subsequently posting previous reporting points |
| RM841 |
Subseq. pstg of prev. reporting point qties not allowed f. kanban process |
| RM849 |
*** From here: messages for reversing reprocessing records **** |
| RM850 |
No confirmation documents exist |
| RM851 |
All postprocessing records have been postprocessed |
| RM852 |
No postprocessing records exist for run schedule header & |
| RM853 |
No postprocessing record exists for confirmation document & |
| RM854 |
No postprocessing record has yet been postprocessed |
| RM855 |
No material could be postprocessed |
| RM856 |
No backlogs are created nor are withdrawal quantities corrected |
| RM857 |
There are inconsistencies in the postprocessing records |
| RM858 |
No changes were made |
| RM859 |
Postprocessing terminated |
| RM860 |
Caution: changes reversed |
| RM861 |
Insert entry in table AFFW_CNEU has no corresponding RSPOS |
| RM862 |
Confirmation carried out without reference to a RS header |
| RM863 |
Please enter a sales order item for the sales order |
| RM864 |
Production lot & does not exist |