SAP Messages

Id Title
RM724 Communication or system error when receiving the message
RM725 Program error in function module &
RM726 Processing of the backflush was terminated
RM727 Inspection lot cannot be created for an expired production version
RM728 In the current scenario, partial processes are posted immediately
RM729 Partial proc. posted immediately when conf. sales order w/o cost coll.
RM730 In case of confirmation w. 'Correction', subprocesses posted immediately
RM731 In case of conf. w. 'doc-neutr. cancell.', subprocesses are posted immed.
RM732 In case of RP conf. for planned order, subprocesses are posted immmed.
RM733 In case of conf. for production lot, subprocesses are posted immediately
RM734 In case of final conf. w. qties on line, subprocesses are posted immed.
RM735 Error reading Customizing entry for LIS
RM736 No planned order found for document log number &
RM737 No planned order found for key 'plnum = &'
RM738 GR quantity for confirmation & > total GR quantity for planned order &
RM739 The partial processes are posted immediately for component scrap
RM740 Diff. search strategies for diff. production strategies not allowed
RM741 No reporting points allowed for make-to-order REM
RM745 Cost estimate with costing date in the past not allowed
RM749 Collective mess. for mat. & in plant & with version & not executed on &
RM750 Collective confirmation carried out for mat. & in plant & with version &
RM751 Material document & was posted
RM752 Activity document & & was posted
RM753 Reporting point document & was posted
RM754 Backlog single document & was posted
RM755 If the cumulative record is changed, all individual records are adjusted
RM756 No quantity change allowed if individual postprocessing records
RM757 Inconsistencies exist in the postprocessing records of material &
RM758 Documents were created
RM759 Numbering of "RSPOS" carried out for "RSNUM" = &
RM760 No matching user with name & found
RM761 User &1 does not have RFC authorization
RM762 Separate aggregation of goods issues and activities not possible
RM763 Unit of measure in routing header changed. Costing not possible
RM764 At least one item was not deleted due to non-cumulated backlogs
RM765 Item cannot be deleted (non-cumulated backlogs)
RM769 You are not allowed to change partially confirmed planned order &1
RM770 Cancellation not poss. because decoupled conf. already post-executed
RM771 Cancellation not possible because RP document &1 not cancellable
RM780 Parallelization type of confirmation processes not yet defined
RM781 vvvvvvvvvvv Error messages for 4.6A
RM782 Enter a quantity
RM783 Enter either sales order, planned order or material
RM784 Detailed settings not possible in case of activity confirmation
RM785 User wants to limit selection further
RM786 Incorrect authorization profile for authorization object &1
RM787 No authorization for: &1 in plant &2, storage location &3
RM788 Material number or planned order required
RM790 Only "scrap confirmation at reporting point" possible
RM791 Reporting point & was deleted: Document can no longer be cancelled
RM792 Confirmation type reset to assembly confirmation
RM793 Switched to "Propose all components"
RM794 Switched to "Propose all operations"
RM795 Sales order copied from the planned order
RM796 Cancelled by user
RM797 Entry variant no longer exists
RM799 ***** From here: messages for actual confirmation of activities ********
RM800 First operation is already reached
RM801 Last operation is already reached
RM810 Error during unit conversion
RM811 When calculating differences, actual activity must be > target activity
RM812 Activity type in row & for cost center & not allowed
RM813 Selected row is already an excess activity row
RM814 Target activity is 0. No differences will be calculated
RM815 No row was selected
RM816 In row &, no activity unit has been specified
RM817 Not all rows could be deleted
RM818 Work center & does not exist in plant &
RM819 You have not selected an operation
RM820 Reference qty zero (Target confirmation of all operations not possible)
RM821 No activity type has been specified in row &
RM822 Confirmation data set to target value of new work center
RM823 No rows will be deleted
RM824 No operation requiring confirmation exists in the routing
RM825 You must have maint. at least one standard value parameter per operation
RM826 A maximum of six activity parameters possible
RM827 No activities posted
RM828 Error in actual cost calculation
RM829 Postprocessing record with weblnr = & was not locked
RM830 If you change quantity 0, dummy components are not adjusted
RM831 Activity posting document & & no longer exists
RM832 Cost collector & blocked
RM840 No entering of rework when subsequently posting previous reporting points
RM841 Subseq. pstg of prev. reporting point qties not allowed f. kanban process
RM849 *** From here: messages for reversing reprocessing records ****
RM850 No confirmation documents exist
RM851 All postprocessing records have been postprocessed
RM852 No postprocessing records exist for run schedule header &
RM853 No postprocessing record exists for confirmation document &
RM854 No postprocessing record has yet been postprocessed
RM855 No material could be postprocessed
RM856 No backlogs are created nor are withdrawal quantities corrected
RM857 There are inconsistencies in the postprocessing records
RM858 No changes were made
RM859 Postprocessing terminated
RM860 Caution: changes reversed
RM861 Insert entry in table AFFW_CNEU has no corresponding RSPOS
RM862 Confirmation carried out without reference to a RS header
RM863 Please enter a sales order item for the sales order
RM864 Production lot & does not exist
Lines 472101 to 472200 of 607611 entries
1 4,720 4,721 4,722 4,723 4,724 6,077