Id | Title |
---|---|
C!013 | Log could not be found |
C!014 | No assignment of the system message(s) to mail partner(s) found |
C!015 | & message(s) being sent |
C!016 | No system messages occurred |
C!017 | Tolerance limit was exceeded when number & was assigned |
C!018 | You cannot save the error log as the number range is exhausted |
C!019 | Error in application &: System message &2 &3 contains unknown msg. type |
C!020 | Department does not exist |
C!021 | Output of error log in spool request & |
C!022 | List of system messages is printed on printer & |
C!023 | The message type cannot be changed for system message & & |
C!024 | Msg.severity must be greater than that specified in the SAP applic. |
C!025 | Object structure & does not exist or is too long |
C!026 | Sub-object structure (DDIC) & does not exist or is too long |
C!027 | Internal error: Program generation & incorrect |
C!028 | Log table has more than 99999 entries |
C!029 | Log table has more than 99999 entries |
C!030 | Message severity must be lower than that defined by the application |
C!031 | The additional info structure (DDIC) & does not exist |
C!744 | & items(s) selected |
C!800 | Internal error in error management table |
C!900 | **** Temporary messages **** |
C!901 | Error control not active today due to conversion! Info: Tel. 3384 |
C!902 | Further log & set to zero although product cost estimate already zero |
C#001 | A serious error occurred when processing the program |
C#002 | Personnel resource &1 has already been assigned to activity &2 &3 |
C#003 | Profile & does not exist |
C#004 | Availability can only be displayed for personnel resources |
C#005 | Availability already displayed |
C#006 | Assign the personnel resource(s) to an activity |
C#007 | Function only possible for activities |
C#008 | Function only possible for assignments |
C#009 | Assignment not possible since work center & was not found |
C#010 | Data was saved |
C#011 | Personnel resource &1 not found |
C#012 | You cannot delete the assignment because of overlapping distributions |
C#013 | Assignment cannot be changed because of overlapping distributions |
C#014 | The work distributed to personnel resource &1 was rescheduled |
C#015 | No hit list could be produced for network activity &1 &2 |
C#016 | Error when converting units |
C#017 | No qualification profile has been assigned to network activity &1 &2 |
C#018 | Operation dates are not within the planning period |
C#019 | Object type & cannot be selected |
C#020 | Work center &1/personnel resource &2 contains inconsistent data |
C#021 | Error defining the planning period |
C#022 | No selection criteria specified |
C#023 | Planning period is longer than period display |
C#024 | Enter a factory calendar |
C#025 | Enter a fiscal year variant |
C#026 | You must first store temporarily before you can change or delete |
C#029 | First select a work center |
C#030 | First select an activity |
C#031 | First select a personnel resource and an activity |
C#032 | First select an assignment |
C#033 | First select a personnel resource |
C#034 | Assignment not possible: &1 activity &2 &3 &4 |
C#035 | Assignment not possible; Activity &1 &2 &3 duration = 0 |
C#038 | No project was found for the selection criteria |
C#039 | No WBS element was found for the selection criteria |
C#040 | No work center was found that fitted the selection criteria |
C#041 | No network was found for the selection criteria |
C#042 | No personnel resources were found for the selection criteria |
C#043 | No requirements were found for the selection criteria |
C#044 | No activities were found that fit the selection criteria |
C#048 | Activity &1/&2 locked the system status |
C#049 | Activity &1/&2 is already been processed by &3. |
C#050 | Network &1 cannot be locked |
C#051 | Start (Date/Time) occurs after the finish (date/time) |
C#054 | Confirmed assignments cannot be deleted |
C#101 | Program error: There is distributed work without capacity requirements |
C$000 | These are the messages for Product Safety in the |
C$001 | development class CBUI. |
C$002 | All messages called within the project must be defined |
C$003 | here. |
C$004 | The messages are divided up into the following areas: |
C$005 | Entry already exists; select a different entry |
C$006 | Message no. Usage |
C$008 | 100-199 General messages (called in various components) |
C$009 | 200-249 Spec. Header, List Header, ID, Spec.-Material Assgmt |
C$010 | 250-299 Value Assignment for Properties |
C$011 | 300-326 Value Assignment for Additional Info |
C$012 | 327-349 Value Assignment for Properties (cont.) |
C$013 | 350-399 Phrase Management |
C$014 | 400-449 Reporting (Symbol Management) |
C$015 | 450-549 Import/Export |
C$016 | 550-579 WWI |
C$017 | 580-599 Value Assignment for Properties (cont.) |
C$018 | 600-600 Creation of Change Documents (Special Case) |
C$019 | 601-648 Specification Information System |
C$020 | 649-699 Reporting (Dialog Boxes) |
C$021 | 760-779 Reporting (Screens) (Continuation 1) |
C$022 | 780-799 XPRA Conversion Characteristic Number->Characteristic Name |
C$023 | 800-810 Buffer Messages |
C$024 | 810-819 SD Link to EH&S |
C$025 | 820-849 Report Generation |
C$026 | 850-879 Reporting (Screens) (Continuation 2) |
C$027 | 880-899 Test messages (deleted before delivery) |
C$028 | 900-999 User-defined messages |
C$100 | ------------ General Messages (Called in Various Components) ------------ |
C$101 | You have reached the first data record |