SAP Function SMB_UIE_PP_PLANNED_ORD - Number of planned orders in different time horizon

Parameter Reference Type Length Text
ET_MRP_CONT SMB_UIE_MRP_CONTROLLER_TT h 3 MRP Controller
ET_PLANNED_ORD_TIME_HZN SMB_UIE_MRP_PLANT_PRODSCHED_TT h 22 MRP Cont, Plant, Prod Sched for Time Horizon
ET_PLANT SMB_UIE_PLANT_TT h 4 Plant
ET_PROD_SCHED SMB_UIE_PROD_SCHEDULER_TT h 3 Production Scheduler

Functionality
This function module gives information about number of planned order atdifferent time horizon for the given Plant, MRP controller andProduction Scheduler.

Notes
o,,Authorizations required for the FM.
o,,Different time horizon would be - Overdue, Today, 1-7 Days and 8-14Days.
o,,Plant, MRP Controller and Production Scheduler are listed indifferent table for the purpose of selection criteria.