SAP Function RM_GAP_FOR_MATURITY_SCEN_GUV - IS-B: RM Gap Evaluation for Due Date Scenarios (P+L)

Parameter Reference Type Length Default Optional Text
IS_JBRGAPPARAMETER JBRGAPPARAMETER u 208 Input Parameter
I_PHNODE SEUCOMM u 1163

Parameter Reference Type Length Text
LOC_ERROR_ITAB TVEH_ERROR_ITAB_TAB 0 Local Error Table

Parameter Reference Length Optional Text
E_HTEXT_TAB JBRNAMEDAT 171 X
E_JBRPHAMORTRES JBRPHAMORTRES 219 Results Structure for Gap Analysis for Drilldown
I_JBRDATE JBRDATE 8 Maturity Band
I_JBRPHAMORTRES JBRPHAMORTRES 219 Preliminary Gap Results Structure
I_JBRPHBAUM JBRPHBAUM 92 Tree Structure for Portfolio Hierarch
I_JBRZUORDN JBRZUORDN 34

Exception Text
ERROR_FOUND Error in the input structure

Functionality
The interim gap results objects that were generated by the creation ofthe due date scenarios have to be enriched and aggregated parallel tothe gap analysis.
The modules that the gap report calls in the later part of the processare also called here.

Further information
See also the documentation for report RJBRGAP2.