| Parameter | Reference | Type | Length | Default | Optional | Text |
|---|---|---|---|---|---|---|
| AENNR | CCIN-AENNR | C | 12 | Change Number | ||
| AEOBJ | CCIN-AEOBJ | N | 1 | Engineering Change Management Object | ||
| DOKNR | CCIN-DOKNR | C | 25 | X | Document Number | |
| MATNR | CCIN-MATNR | C | 18 | X | Material Number | |
| PLNNR | CCIN-PLNNR | C | 8 | X | Key for task list group | |
| PLNTY | CCIN-PLNTY | C | 1 | X | Task List Type | |
| PVSGUID | CCIN-PVSGUID | C | 32 | X | ||
| PVSTY | CCIN-PVSTY | C | 1 | X | PVS Type | |
| STLNR | CCIN-STLNR | C | 8 | X | Bill of Material | |
| STLTY | CCIN-STLTY | C | 1 | X | BOM Category |