| Parameter | Reference | Type | Length | Default | Optional | Text |
|---|---|---|---|---|---|---|
| I_CALENDAR1 | IBKK42-CAL_ID1 | C | 2 | X | Public Holiday Calendar ID 1 | |
| I_CALENDAR2 | IBKK42-CAL_ID2 | C | 2 | X | Public Holiday Calendar ID 2 | |
| I_DUE_DATE_OLD | BKKM2-NEXT_DATE | D | 8 | Old Due Date | ||
| I_KEY_DATE | BKKM2-KEY_DATE | N | 2 | X | Key Date | |
| I_PERIOD | BKKM2-PERIOD | N | 3 | Period Length | ||
| I_PER_UNIT | BKKM2-PER_UNIT | C | 1 | Period Unit (Calendar Days, Months) | ||
| I_REFDATE | BKKM2-NEXT_DATE | D | 8 | SY-DATUM | X | Reference Date (See Long Text) |
| I_SWERK | TBKKG2_DATE-WORKDAYSHIFT | N | 1 | G_CON_NO_WDAY_SHIFT | X | Type of Shift to Working Day |
| I_XFUTURE | BOOLE-BOOLE | C | 1 | X | Indicator: Increase Date to Date in Future |
| Parameter | Reference | Type | Length | Text |
|---|---|---|---|---|
| E_DUE_DATE_NEW | BKKM2-NEXT_DATE | D | 8 | New Due Date |
| E_DUE_DATE_NO_SHIFT | BKKM2-NEXT_DATE | D | 8 | New Due Date Without Working Day Shift |
| E_RC | SYST-SUBRC | I | 4 | Return Code (See Long Text) |
| E_X_WORKDAY_SHIFT | BOOLE-BOOLE | C | 1 |
| Exception | Text |
|---|---|
| INPUT_MISSING | Missing Input Parameters |
| INVALID_DATE | Invalid Date |
| INVALID_PERIOD_UNIT | Invalid Period Unit |
|
Value range Description Value range |