| Parameter | Reference | Type | Length | Default | Optional | Text |
|---|---|---|---|---|---|---|
| I_PROGDATE | BANK_DTE_PP_PROGDATE | D | 8 | Date of Program Run | ||
| I_PROGN | BANK_DTE_PP_PROGN | C | 40 | Name of the Program/Report on an Application Process | ||
| I_PROGNO | BANK_DTE_PP_PROGNO | N | 3 | Sequential Number of the Program Run | ||
| I_STEPNO | BANK_DTE_PP_STEPNO | N | 3 | Number of a Processing Step |
| Parameter | Reference | Type | Length | Text |
|---|---|---|---|---|
| E_PACKMANID | BANK_PACKMANID | X | 16 | ID of a Package Administrator Object |
| E_PROCESSID | BANK_DTE_JC_PROC_ID | X | 16 | Process ID |
| E_STARTTIME | BANK_PP_STEPDATA-STARTTIME | N | 15 | Time of change |
| E_STARTUSER | BANK_PP_STEPDATA-STARTUSER | C | 12 | SAP System, User Logon Name |
| E_WORKLID | BANK_WORKLID | X | 16 | ID of a Worklist for Parallel Processing |