Oracle Message ORA-16416 - Switchover target is not synchronized with the primary

ERRORSwitchover target is not synchronized with the primary
CAUSEThe switchover target incurred an error or has a gap at the time the switchover operation was attempted.
ACTIONAllow the switchover target to become synchronized and then re-attempt the switchover.