Solution : https://service.sap.com/sap/support/notes/353255 (SAP Service marketplace login required)
Summary :
This SAP Note introduces new individual overviews as enhancements to those detailed in Note 326591, which differentiate between easy-to-use transactions for occasional users and more comprehensive functions for power users. These overviews are designed for intuitive operation, providing key functionalities without replacing the more comprehensive classic views, which remain accessible for frequent users requiring advanced features. The implementation procedure involves program modifications and ensuring all referenced notes are applied. A newly designed interface for structure overviews will not be developed due to technical limitations, but existing functionality remains supported.
Key words :
cn42n project definitioncn43n wbs elementscn44n planned orderscn45n orderscn46n networkscn47n activities/elementscn48n confirmationscn49n relationshipscn50n capacity requirementscn51n production resources, title text displayed fields sorting filter exceptions hidden rows unit conversion, wbs elements orders networks activities / elements components executing, edit --> maintain texts --> maintain title text, goto --> drilldown report --> run drilldown report, goto --> drilldown report --> assign drilldown report, sap system --> lists --> sap list viewer, basis --> basis services / communication interface, language-dependent source code sections, directory general/r3server/abap/note
Related Notes :
| 700875 | FAQ 2: Structure Overview / Individual Overviews |
| 516479 | Consulting notes Logistic Information System |
| 502879 | (NIO) Executing in the background |
| 458602 | Individual overview WBS elements:SD document is missing |
| 434400 | (NIO) Branch to operation maintenance order |
| 399013 | Additional calculation for external activities |
| 395728 | CXPS - Scheduling modules: several minor points |
| 395158 | PS: Duration calculations for network/order |
| 394518 | Order number not in defined field of activity |
| 394238 | I_FCALID is not transferred |
| 387434 | PS: Date calculations for milestone |
| 377688 | Call of Project Builder from info system |
| 375503 | PS: Date calculations for activity / WBS |
| 365224 | Results analysis ignores WBS elements |
| 326591 | PS: Structure overview, individual overviews in 4.6 |
| 13719 | Preliminary transports to customers (note for customers) |