Solution : https://service.sap.com/sap/support/notes/401347 (Connexion à SAP Service Marketplace requise)
Résumé :
SAP Note clarifies the missing rescheduling messages in Transaction MD04 for materials planned with periodic lot size, visible in MD05 post-Release 4.6A upgrade. The discrepancy arises from alignment of receipt elements with requirements within the same lot size period, previously generating unneeded alerts. Customization in MRP, field V439A-TERBV, decides the period's timing for availability dates affecting message display. The fix involves enhancing MD_LOT_PERIOD_CHECK in SE37, with specific changes in the "Changing" tab and implementing attached corrections, ensuring accurate exception message conditions align with the configured lot size period.
Mots Clés :
2001 planned order 7the mrp controller set, date mrp element receipt/requirements 10, function module md_lot_period_check call, generated unnecessary exception messages, set lot size, compare planned order, firmed planned order, periodic lot size, additional key words, flexible period length
Notes associées :
| 724589 | Periodic lot size: Exception message 'shift' is missing |
| 550302 | FAQ: Rescheduling check |
| 29703 | Exception messages in materials planning (docu) |
| 25388 | MD01, MD02, MD03: Rescheduling proposals: Docum. |