| ERROR | prepare to switchover has not completed |
| CAUSE | An ALTER DATABASE PREPARE TO SWITCHOVER command was issued, but the prepare activity did not complete. |
| ACTION | Verify that the standby was prepared properly. You may cancel the prepare and perform an unprepared switchover which requires a database link to complete. Or reissue the prepare operation on the standby. |