| 127242 | MC8G:Missing restriction options for bkgd planning |
| 65027 | Termination of mass processing: internal error 026 |
| 93469 | Copy data: nothing is copied |
| 133795 | Mass processing: incorrect status in table LISPLF |
| 89873 | Mass processing: log is incorrect |
| 95445 | SOP forecast: incorrect number of historical values |
| 75850 | Mass processing: Product group without members |
| 70680 | Job cannot be scheduled if no job name |
| 140596 | Mass processing: incorrect no. of decimal places |
| 90098 | Copying: changed planned unit is not considered |
| 85493 | Batch f.lvl-by-lvl plann.w/o predef.strge periodcty |
| 89875 | material-independent plant distribution for copying |
| 65372 | Various functns related to actual data in backgrnd |
| 143248 | Mass processing:incor. factory calendar f. forecast |
| 358083 | Incorrect block entries in mass processing |
| 85990 | Mass processing for S076 - standard SOP |
| 86122 | Copying existing 0-values from other infostructures |
| 105896 | Transfer to demand management with posting period |
| 93726 | RMCP6BRU: incorrect text for the selected job |
| 88456 | Mass processing: planning job 'After job' |
| 89867 | Mass processing: transfer terminates / ... |
| 708883 | Planning: Maintaining activities in mass processing |
| 699137 | Forecast: MAD calculated incorrectly |
| 94668 | RMCAMUS6: Pl.type, versn & informtn strctr incorr. |
| 733442 | Forecast: Short dump COMPUTE_FLOAT_ZERODIVIDE |
| 80229 | Mass processing: MA347 (reason W) despite operation |
| 385548 | Mass processing: Performance of the lock logic |
| 138748 | Mass processing: Incorrect lock entries |
| 704356 | Forecast: Zero historical values with seasonal model |
| 188707 | Macro calc. for planning type w/o planning horizon |
| 302297 | Mass processing: Key figures with 'no aggregation' |
| 105376 | Transfer to demand management: error message MA640 |
| 719900 | Forecast: Model selection procedure 2 incorrect |
| 710283 | Forecast: Short dump "CONVT_OVERFLOW" |
| 64740 | Info structure data copy: not enough target periods |
| 934270 | External forecast BADI /SAPAPO/SDP_FCST_EXT- raise exception |
| 665125 | Forecast: Parameter optimization for model selection |
| 530815 | Transfer program planning: GV dragged from material master |
| 79957 | Copy data: incorrect results |
| 443735 | modification: transfer of PIRs including char. combs |
| 80881 | Consulting: mass processing |
| 82407 | Cap. rqmnts planning w. rough-cut planning profile |
| 815844 | Mass Processing: long runtime / poor performance |
| 546079 | FAQ: Background jobs in Demand Planning |
| 841358 | FAQ: Flexible Planning |