| 137135 | FERT-Generator does not accept reference material |
| 132230 | New Functionality for FERT Generator |
| 143417 | Wrong Handling for multiple Org.Levels by FERT Gen. |
| 141372 | AFS - FERT Generator: Assign Routing |
| 429388 | Low-level configuration and sales order scenario |
| 134721 | Errormsg. 8J589 in FERT Generator: Different UOM |
| 90373 | Flexible plnd indpdnt rqmnts consumption modificatn |
| 126774 | Problems displaying MRP results |
| 401612 | Information: Overhead calculation in costing |
| 184977 | Missing sizes in planned orders after re-explosion of BOM |
| 214651 | Assembly: Change in sales order results in dump |
| 206337 | Collective note: Import CATT PCS AUTOMOTIVE 4.6B |
| 206683 | Missing English translation CATT test catalog |
| 129267 | CO-PA valuation: exclusive access to costing |
| 1045736 | Assigning specifications in the material master |
| 814673 | MC84: How to identify required fields (MG 144) |
| 67240 | Info: valuation with material cost estimate |
| 12909 | Product groups cannot be created |
| 67452 | Duplicated postings and terminations !!!!!!!!!!! |
| 143314 | APO - R/3 Integration in Production Planning |
| 639315 | Change of accesses of BAdI to Enterprise adapter |