| 488542 | CO40: Operation assignment of class items |
| 757975 | Error TD607 when you convert planned order |
| 595217 | Control recipe creation performance |
| 540614 | Partial conversn: Wrong component qntities in collctve order |
| 455047 | CO40: Co-products with alternative unit of measure |
| 527615 | CO40/COR7: planned orders not deleted |
| 391974 | CO40: Multiple explosion of the BOM |
| 643642 | No goods receipt for co-products |
| 323733 | 'TABLE_INVALID_INDEX', 'SAPLCYBT' |
| 533464 | CO40: Assembly scrap in collective orders |
| 516986 | Purchase requisition generated for components |
| 519857 | Incorrect cost element in collective order |
| 379750 | Conversion of planned order and ATP in APO |
| 78747 | COR2/CO02 with alternative components: Short dump |
| 328280 | COR8: Error CO706 when units of measure converted |
| 494792 | Program termination CO650 during planned order conversion |
| 308247 | COR7/CO40: Missing settlement rule |
| 360810 | CO40: Update termination with message CO901 |
| 426192 | Manufacture of co-products apportionment structure, cost di |
| 532665 | Dump COMPUTE_FLOAT_ZERODIVIDE in the availability check |
| 140712 | COR7,COR8: Co-product w. incorrect storage location |
| 215554 | Incorrect operation data aft.planned order conversn |
| 744382 | PPBICO40: BOM status not released for orders |
| 526994 | Process order - loading of unnecessary function groups |
| 451236 | Incorrect component quantities in phantom assemblies |
| 124102 | Approval with blocked materials |
| 432100 | Rounding requirement quantity co-products / by-products |
| 521176 | Reduction of the data control blocks part 9 |
| 166979 | Reschedule planned orders for recipes |
| 597600 | Maintaining settlement rule after adding a co-product |
| 101715 | Conversion plannd order into approved process order |
| 115417 | Joint production/production in another plant |
| 155885 | Status CREF is not set in operation |
| 371682 | Incorrct component quantities in phantom assemblies |
| 435401 | Deleting indicator 'Backflush' |
| 520904 | Reduction of the data control blocks part 7 |
| 69722 | Error TD607 during planned order conversion |
| 1538846 | Long texts disappear when you jump to other transactions |
| 1432630 | Value update from wrong valuation area |
| 521076 | Reduction of the data control blocks part 8 |
| 157090 | Runtime problem with Transaction COR1,COR7,COR8 |
| 480472 | Convertng plannd orders:Basic finsh date by 1 day too early |
| 93586 | Process order: sequence of the materials |
| 457518 | "Select all" function remains ineffective |
| 163710 | GMP: Dispatched resource in approved order |
| 95973 | Missing status object when converting planned order |
| 534269 | Conversn of plannd ordr and discontintn: Incorrct ATP reslts |
| 448945 | CO40:incor. requirement quantity with alternative components |
| 1125980 | Requirement quantity for batch split of successor components |
| 508480 | Operation quantities after change of header quantity unit |
| 454333 | Performance when saving process order |
| 191279 | Operation: Status WCRE, although resource allowed |
| 459288 | Schedule line copied from sales order to production order |
| 364286 | MF50: Conversion of planned order does not work |
| 209855 | CO40, CO41: incorrect conversion between units |
| 111031 | No - sign for issue quantity |
| 422750 | Manual change/entry of the batch number |
| 100534 | CO40: Settlement rule for non-valuated material |
| 883064 | Status after you change special stock indicator |
| 79885 | Scheduling planned order:operations are deallocated |
| 307192 | Approval takes no resource sel.condition into accnt |
| 338051 | Modification: Planned order conv. and cumulation 3 |
| 88374 | Process order: automatic batch creation |
| 1303136 | Alternative unit of measure: Order header quantity |
| 1112075 | Simple discontinuation: incorrect qty follow-up materl w/ATP |
| 338075 | Modif.: Deactivating cumulation '3' for prod. order |
| 1392886 | Converting planned order: Log master data |
| 392789 | Requirement quantity for discontinued materials incorrect |
| 555387 | Externally procured components not relevant to costing |
| 821624 | Non-valuated material in valuated sales order stock |
| 424927 | No order transfer from R/3 to APO |
| 562047 | Storage location not transferred during master data transfer |
| 101909 | Incor.batch determntn when converting planned order |
| 536513 | ATP: delivery proposal screen for one component only |
| 427042 | Rounding of requirement quantity co-products / by-products |
| 325236 | Planning run during planned order conversion |
| 1362114 | Simple discontinuation: Reqmt too high before effect.out dte |
| 860094 | Reading master data: no automatic release |
| 494453 | Hint about an error when reading the master data |
| 113906 | Incorrect scrap qty when converting planned order |
| 536534 | Dump COMPUTE_BCD_OVERFLOW for availability check |
| 440585 | Read master data for collective orders |
| 1361216 | ATP check: Runtime error COMPUTE_BCD_OVERFLOW |
| 524487 | Order not yet created is locked |
| 400444 | Material component batch after goods withdrawal |
| 318469 | Short dump after reading master data, status of components |
| 509420 | Change Net quantity - operation quantities adjustment |
| 456764 | Batch assignment and availability check |
| 149866 | Conversion planned order, approval and release |
| 215123 | Discontinuation and approval in the process order |
| 456777 | Order numbers for internal number assignment |
| 1421880 | System issues error message CBRC_REGCHECK 092 unnecessarily |
| 445281 | Indicator 'Final issue' is missing in material list |
| 356327 | Classification in orders, projects, networks |
| 501718 | Integration models for manufacturing order integration |
| 582634 | CO07: Shop floor controller and MRP controller not copied |
| 449944 | Process materials in production planning |
| 552916 | ATP for parts to be discontinued w/ partial confirmatn logic |
| 688148 | Error when reading the routing results in termination |
| 444000 | Note search for process orders |