| 891061 | EL28 interval check and suppression logic |
| 217182 | Assessing - Execution although no assessing exists |
| 967468 | EL28 Estimates for old date when meter reading date changes |
| 790681 | EL28 Move-in or move-out date can be changed |
| 1127474 | EL28 System determines an expected consumption of zero |
| 963624 | EL28 No check for change of the meter reading date |
| 169050 | Entering double meter readings using EL28 |
| 212274 | Error message EL452 |
| 1539386 | Different meter reading date during order creation with EL28 |
| 300181 | Dialog box during order creation to device level |
| 885807 | EL28 Whole number and dec places aft modification not checkd |
| 183375 | Process meter read. orders of tech. installed devices |
| 171184 | Creating billing orders after cancellation |
| 166874 | Dependent validation: Cosine phi |
| 149961 | Overestimation factor with estimation of MR results |
| 177656 | Performance optimization within order creation |
| 163501 | Dependent validations not run through |
| 186651 | Met. read. dataproc.: multpl trig. of ident. events |
| 151163 | Event: ENTEREDIMPLAUSIBLE not triggered |
| 163360 | Validation 96 - Fixed value deviation |
| 200660 | Scheduled billing date in meter reading results |
| 306267 | Independent validation: Fixed value deviation |
| 170525 | Overview information for validations |
| 162904 | EL28:Serial switching - MR entry f. secondary meter |
| 167728 | Dependent validations: Short dump BCD_ZERODIVIDE |
| 171972 | Single entry: meter reading reason = contract change |
| 158676 | Extrapolation from period of previous year |
| 303353 | Extrapolation with base period category 'X' |
| 162565 | EL28: Entry for double-rate meters - MR status = 0 |
| 169549 | Overview information for validations |
| 308927 | Assessing with "real overflow" |
| 190433 | Meter reading to be billed differs from read MR |
| 208464 | Uploading MR results: plausibility check 96 |
| 162164 | Correction for MR results:No consumption adjustment |
| 166677 | Status update for billing data record |
| 1504438 | EL28/ICWC: Meter reading type when estimated w/ changed date |
| 1180536 | Active estimatn for resetting register during MR at move-in |
| 311677 | EL27: Consumption not adjusted when MR changed |
| 169607 | Billing data record status update |
| 173223 | Termination of interpolation |
| 165881 | Overview information for validation |
| 199117 | Met.read data processing: device 'choose' incorrect |
| 1574662 | Expected meter reading in overview of validations |
| 156510 | Suppression of meter reading orders |
| 167378 | Determining forecast start and forecast end |
| 158685 | Extrapolation termination for fixed value weighting |
| 335999 | EL28: EL401 future meter reading lower |
| 201982 | Enter MR results: No consideration of future MRs |
| 168254 | Update of a maintenance order |
| 151862 | Nonact. instal.aft.instal./remov.&move-in/out cycle |
| 186955 | Mult. meter read. order creation w. dev. replacemnt |
| 195559 | Endless loop in order creation reg. relationship |
| 177180 | Rounding decimal places for multiple registers |
| 329644 | MR estimation: Overflow during arithmetic operation |
| 214924 | EL28:Assessing prformd w.real prev.mtr readng rsult |
| 206015 | Interpolation of several MRs within entry interval |
| 149936 | Ignoring leading zeros for meter reading result |
| 188309 | MR entry: Tolerance limit valid. for sev. periods |
| 309840 | EL27 - EL29: EL401 also with balancing registers |
| 202822 | Periodic order creation for device |
| 184735 | Incorrect error message with order creation |
| 168249 | EL27: No SM order with control reading order |
| 196043 | EASIBI: Incorrect extrapolation budget billing plan |
| 154237 | Extrapolation after device replacement: Error E9014 |
| 215492 | Extrapolation for balancing consumption registers |
| 172393 | Extrapolation of move-in meter readings |
| 171410 | Repair f. repeated order creation (add.Note 170423) |
| 152010 | Extrapolation after device replacement: Error E9014 |
| 158032 | Extrapolation of balancing consumption registers |
| 188210 | Meter reading estimation: meter reader is deleted |
| 165677 | Wrong error class for tolerance limit validations |
| 148980 | Update of events at entry |
| 186696 | Assessing workflow not started |
| 302024 | EL28: Meter reading date ready for input f. move-in |
| 203739 | Interpolation on account of control MR order |
| 151877 | Meter reading order creation during deregulation |
| 304599 | Extrapolation with base period category 'X' |
| 162271 | Extrapolation from period of previous year |
| 200306 | Meter reading result extrapolated incorrectly |
| 149079 | Avoidance of double meter reading results on entry |
| 158921 | Display of forecast period in bill printout |
| 172514 | Term. in extrapolation during fixed value weighting |
| 187111 | Decimal places with meter reading results |
| 209788 | Identical meter reading time with meter readings |
| 166159 | Consider disconnection periods for extrapolation |
| 304127 | MR type - entry of MR disconnection / move-in/out |
| 332323 | Assessing: Assessing not triggered |
| 162659 | EL28 Prog. termination when accessing w. MR reason |
| 160112 | EL28: Meter reading type customer/estimation |
| 184874 | Extrapolation w/o estimated meter reading results |
| 174039 | Deregulation change of contract: Fixed MR date |
| 145527 | Meter reading entry: Consumption determination |
| 188364 | Processing MR documents of uninstalled devices |
| 188562 | Scheduled billing date in meter reading results |
| 145637 | Entry of MR results with change of supplier |
| 188855 | Meter reading data: List of information on validation |
| 166955 | Meter reading results with different MR date |
| 197610 | Assessing not recognized w. over-run estimatd value |