| &CAUSE&>To change or delete a plan in the target system, you have to transfer awork area from the Engineering Workbench.
 System ResponseThe application is not carried out.
 ProcedureEnter a work area that has been maintained in the target system inCustomizing for the Engineering Workbench (menu path: Production-> Basic Data -> Engineering Workbench -> Process Work Areas)>>
 The work area must meet the following requirements:
 Focus:>
 Routing header
 Automatic lock:>
 Routing headers
 Sequences
 Operations
 BOMs
 Items
 The work area contains:>
 Routing header
 Sequence
 Operation
 Suboperation
 PRT
 Inspection characteristic
 Special inspection characteristic specifications
 BOM header
 Item
 Subitem
 Component assignment
 |