| DiagnosisFactory calendar &V1& was read for the date interval &V2& to &V3&. Thisdate interval is totally or partially outside the validity area of thisfactory calendar. This means that no information can be determined fromthe factory calendar (for example, about public holidays).
 System ResponseProcessing is cancelled.
 ProcedureModify factory calendar &V1& so that the date interval is within thevalidity area.
 |