| WRF_PRC_SCD435 |
Ship-to party missing; GR processing time cannot be determined |
| WRF_PRC_SCD436 |
Dateline will be created with default planned delivery time of 99 days |
| WRF_PRC_SCD437 |
Simplified date calculation carried out with planned delivery time |
| WRF_PRC_SCD438 |
Error in scheduling, date line cannot be calculated |
| WRF_PRC_SCD439 |
Automatic date shift will be executed with an interval of zero days |
| WRF_PRC_SCD440 |
The interval between 2 dates is greater than 999 days |
| WRF_PRC_SCD441 |
You can no longer change the transportation chain at this point |
| WRF_PRC_SCD442 |
The time sequence of the start dates is incorrect |
| WRF_PRC_SCD443 |
Date lead time or date follow-up time for date &1 will be modified |
| WRF_PRC_SCD444 |
The total interval is greater than 999 days |
| WRF_PRC_SCD445 |
&1 was changed from &3 to &4 in accordance with delivery cycle &2 |
| WRF_PRC_SCD446 |
&1 was changed from &3 to &4 in accordance with order cycle &2 |
| WRF_PRC_SCD447 |
It is no longer possible to change the transportation chain |
| WRF_PRC_SCD448 |
System could not determine The calculation type |
| WRF_PRC_SCD449 |
It is no longer possible to change vendor/switch transportation chain |
| WRF_PRC_SCD450 |
It is no longer possible to switch the internal transportation chain |
| WRF_PRC_SCD451 |
Error while transferring actual dates from the old dateline |
| WRF_PRC_SCD452 |
Actual start date posted is not last date on dateline |
| WRF_PRC_SCD453 |
Incorrect scheduling call; see the long text |
| WRF_PRC_SCD454 |
Transfer date for Incoterm &1 found w. normal, but not dispatch method &2 |
| WRF_PRC_SCD455 |
Combination of distribution center and dispatch method is not permitted |
| WRF_PRC_SCD456 |
Combination of store and dispatch method is not permitted |
| WRF_PRC_SCD457 |
Date &1 has already been posted and may not be changed |
| WRF_PRC_SCD458 |
Incorrect scheduling call, start date was not transferred correctly |
| WRF_PRC_SCD459 |
Int.trnsp.chain not maintained in supplying plnt asgt for &1 nor in DC &2 |
| WRF_PRC_SCD460 |
Change of internal transport chain not possible |
| WRF_PRC_SCD461 |
Automatic date shift for the order date is not permitted |
| WRF_PRC_SCD462 |
You cannot select the order date as the start date |
| WRF_PRC_SCD463 |
Switch to internal transportation chain &1 is not possible |
| WRF_PRC_SCD464 |
Switch to internal transportation chain &1 is not possible |
| WRF_PRC_SCD465 |
Assignment of ship-to party and transportation chain not permitted |
| WRF_PRC_SCD466 |
Combination of ship-to party and dispatch method is not permitted |
| WRF_PRC_SCD467 |
Automatic date shift to the past is not permitted |
| WRF_PRC_SCD468 |
Scheduling is deactivated |
| WRF_PRC_SCD469 |
No transportation chain is assigned to vendor &1 |
| WRF_PRC_SCD470 |
Transportation chain &1 (&2) for dispatch method &3 is not an ext. TC |
| WRF_PRC_SCD471 |
Transportation chain &1 (&2) for dispatch method &3 is not an int. TC |
| WRF_PRC_SCD472 |
No transportation chains are assigned to info record and vendor &1 |
| WRF_PRC_SCD473 |
Date &1 occurs more than once in dateline; this is not permitted |
| WRF_PRC_SCD474 |
Informative date without predecessor &1 was transferred without a date |
| WRF_PRC_SCD475 |
Informative date without predecessor &1; interval is set to 0 |
| WRF_PRC_SCD476 |
Date &1 of the informative date &2 is before the order date &3 |
| WRF_PRC_SCD477 |
Date &1 of the informative date &2 is after the delivery date &3 |
| WRF_PRC_SCD478 |
Internal transportation chain cannot be copied into the dateline |
| WRF_PRC_SCD479 |
No transportation chain is assigned to the info record |
| WRF_PRC_SCD480 |
Staging time is zero |
| WRF_PRC_SCD481 |
All Dates Already Posted, No Start Date Could be Determined |
| WRF_PRC_SCD482 |
No Date Postponement Possible Since All Dates Already Posted |
| WRF_PRC_SCD483 |
The most recently posted date is not in the new transportation chain |
| WRF_PRC_SCD484 |
No transportation chain assigned in vendor master data |
| WRF_PRC_SCD485 |
Deletion of external transportation chain is not allowed |
| WRF_PRC_SCD486 |
Deletion of internal transportation chain is not allowed |
| WRF_PRC_SCD500 |
Date line cannot be checked |
| WRF_PRC_SCD501 |
Date line is not consistent |
| WRF_PRC_SCD502 |
Date line &1 date_id &2: incorrect date type |
| WRF_PRC_SCD503 |
Date line &: different IDs |
| WRF_PRC_SCD504 |
Date line &1 date ID &2: &3 missing |
| WRF_PRC_SCD505 |
Date Line &1 Date &2: Plan Date Earlier Than Tolerance Date |
| WRF_PRC_SCD506 |
Date line &1 date ID &2 incorrect format: &3 |
| WRF_PRC_SCD507 |
Date line &1: &2 cannot have a preceding date |
| WRF_PRC_SCD508 |
Date line &1: &2 must be a operative date |
| WRF_PRC_SCD509 |
Date line &1: &2 must have a preceding date |
| WRF_PRC_SCD510 |
Dateline &1: &2 is inactive |
| WRF_PRC_SCD511 |
Dateline &1 Date &2: Predecessor Date is not an Operational Date |
| WRF_PRC_SCD512 |
Dateline &1 Date &2: Plan Date is Earlier Than Predecessor Plan Date |
| WRF_PRC_SCD513 |
Dateline &1 Date &2: Tolerance Date is Earlier Than Predecessor Tol. Date |
| WRF_PRC_SCD514 |
Date line &1: &2 is predecessor of more than one operative date |
| WRF_PRC_SCD515 |
Date line &1: preceding date &2 does not exist in date line |
| WRF_PRC_SCD516 |
Header structure of date line missing |
| WRF_PRC_SCD517 |
Date line ID missing |
| WRF_PRC_SCD518 |
Date ID missing |
| WRF_PRC_SCD519 |
Actual posting: &1 &2 &3 &4 &5 |
| WRF_PRC_SCD520 |
Dateline is empty |
| WRF_PRC_SCD521 |
Incoterm1 &1 Could not be Determined |
| WRF_PRC_SCD522 |
Incoterm2 &1 was determined in scheduling |
| WRF_PRC_SCD523 |
Transfer location &1 of dateline differs from Incoterm2 &2 |
| WRF_PRC_SCD524 |
Only general leg with country &1 since no transfer region is defined |
| WRF_PRC_SCD525 |
Incoterm1 was deleted; transfer location will also be deleted |
| WRF_PRC_SCD526 |
Cannot determine transfer date &1 in dateline |
| WRF_PRC_SCD527 |
Vendor &1 is monitored, but not transfer date &2 |
| WRF_PRC_SCD528 |
Transfer date is empty |
| WRF_PRC_SCD529 |
Informative Date '&1': Calculated Date is in the Past (&2) |
| WRF_PRC_SCD530 |
Operational date &1 may not be removed from dateline |
| WRF_PRC_SCD531 |
Actual-posted dateline &1 may not be removed from dateline |
| WRF_PRGRP001 |
No free internal price group number could be determined |
| WRF_PRGRP002 |
The to-date is earlier than the from-date |
| WRF_PRGRP003 |
The validity period overlaps with the previous one |
| WRF_PRGRP004 |
There is a gap between the validity period and the previous one |
| WRF_PRGRP005 |
Price level group &1 does not exist |
| WRF_PRGRP006 |
A date field of the price pattern is not filled |
| WRF_PRGRP007 |
A still valid price pattern was deleted |
| WRF_PRGRP008 |
A time gap is created as a result of the price pattern deletion |
| WRF_PRGRP009 |
Price level group &2 is already locked by user &1 |
| WRF_PRGRP010 |
The from-date cannot be set to infinity (31.12.9999) |
| WRF_PRGRP011 |
The price pattern for price level group &1 does not exist |
| WRF_PRGRP012 |
No price levels exist for price level group &1 |
| WRF_PRGRP013 |
Price level group &1 already exists |
| WRF_PRGRP014 |
The price level group field is not filled |
| WRF_PRGRP015 |
Price level group &1 is locked |
| WRF_PRGRP016 |
No description exists for price level group &1 |