Functionality This method transfers evaluated time data from external time managementsystems to the SAP R/3 System. Information on different payment and activity allocation is alsotransferred. Example Notes This method stores the data records in the interface tables PTEX2010and PTEXDIR. Then, the report RPTEXTPT (ExternalTransfer -> Time Management> reads the data from PTEX2010 and storesit as Employee Remuneration Info> in infotype 2010. No cost assignment is supported with this method. The method BAPI: Checks External EmployeeRemuneration Info (with Activity Allocation)> and can check the dataprior to transferring it for plausibility checks.Description INCLUDE BAPI_DATAELEMENT he following data is required:
- Logical system of the original document (Field EXTSYSTEM)
- External application (Field EXTAPPLICATION)
- Document number (Field EXTDOCUMENTNO)
- Personnel number (Field EMPLOYEENUMBER)
- Validity date (Field VALIDITYDATE)
- Wage type (Feld WAGETYPE)
- Depending on the wage type, the following fields are to be completed:
Either number of hours for employee remuneration info (FieldNO_OF_HOURS), or Number of time unit for employee remuneration info (Field NUMBER) andDescription Table with messages from record processing. Critical errors are assigned the types E> (error) and A>(abort). Warnings are indicated by a W>, information and successmessages by I> and S> respectively.
|