Functionality This method transfers evaluated time data from external time managemensystems to the SAP R/3 System. Information on different payment is also transferred. Example Notes This method stores the data records in the interface tables PTEX2010and PTEXDIR. Then, the report RPTEXTPT (ExternalTransfer -> Time Management> reads the data from PTEX2010 and storesit in the Employee Remuneration Info> infotype 2010. Neither cost assignment nor activity allocation is supported with thismethod. The method BAPI: Checks ExternalRemuneration Info (without Account Assignment> and can check the dataprior to transferring for plausibility checks.Description INCLUDE BAPI_DATAELEMENT The following data is required:
- Logical system of the original document (Field EXTSYSTEM)
- External application (Field EXTAPPLICATION)
- Document number (Field EXTDOCUMENTNO)
- Personnel number (Field EMPLOYEENUMBER)
- Validity date (Field VALIDITYDATE)
- Wage type (Feld WAGETYPE)
- Depending on the wage type, the following fields are to be completed:
Either number of hours for employee remuneration info (FieldNO_OF_HOURS), or Number of time unit for employee remuneration info (Field NUMBER) andDescription Table with messages from record processing. Critical errors are assigned the types E> (error) and A>(abort). Warnings are indicated by a W>, information and successmessages by I> and S> respectively.
|