Functionality This method enables you to send projects for which a cost assignment isallowed, to the time recording system. When an employee enters a time event, the corresponding projectinitiates the cost assignment. The projects recorded by the employees are checked (validated) in thetime recording system. Notes This BAPI is method for an interface type. This BAPI uses the definition of the standardized interface. It isimplemented by the system that provides this interface. The data in the structure determined by the BAPI is transferred to thereceiver system. The receiver system then ensures that this data isentered in the applicable database tables. To do so, implement theinterface defined by this BAPI. Further information The report RPTCC108> (HR-PDC: Download WBS Elements)starts the download. Fore more informatio, see the Customizing sectionConnection with External Time RecordingSystem using CC1> in the Implementation Guide (IMG) for Distribution(ALE).Description Method return code Value range If an error occurs, this structure contains, for example, the followinginformation: Message type (TYPE field) Message code (CODE field) Message text (MESSAGE field) Default Critical errors are indicated by E> (error) and A> (abort),warnings by W>, and information and success messages by I>and S> respectively.Description In this structure, the WBS (work breakdown schedule) elements to beposted are sent to an external time recording system.
- COMP_CODE>
- WBS_ELEMENT>
- WBS_ELEMENT_GRP>
- WBS_SHORTTEXT
Short description of the WBS elements
|