Note 162202 - Actual execution times are too long

Header
Version / Date 9 / 2000-01-09
Priority Correction with low priority
Category Program error
Primary Component PP-IS-DC Data Collection
Secondary Components BW-BCT-PP Production Planning and Control

Summary
Symptom

If times are confirmed outside of shifts, the system takes these also into account when the execution and lead times are calculated.In particular, during the conversion into days this causes the result of execution times being longer than one day although only one day has been confirmed.
Example:
A work center from 8 to 17 o'clock with one hour break, thus 8 hours in total. A confirmation from 0 to 17 o'clock has a result of 8 hours with a time from 0 to 8 o'clock (outside of the shift) and 8 hours from 8 to 17 o'clock, thus in total 16 hours. With 8 hours per day, the result is 2 days.

Additional key words

S021, S022, S023, S024, I_DFZ, I_DLZ, I_DFZ_EX, I_DLZ_EX

Cause and prerequisites

The problem is caused by an incorrect entry in the application.

Solution
https://service.sap.com/sap/support/notes/162202

(SAP Service marketplace login required)

Affected Releases
Software Component Release From Release To Release And subsequent
SAP_APPL3030D31I
SAP_APPL4040A40B
SAP_APPL4545A45B
SAP_APPL4646A46A
PI1999.11999_1_31H1999_1_46A
PI2000.12000_1_31H2000_1_45B
PI-A1999.11999_1_30F1999_1_46A
PI-A2000.12000_1_31H2000_1_45B

Correction delivered in Support Package
Support Packages Release Package Name
SAP_APPL40BSAPKH40B21
SAP_APPL40BSAPKH40B23
SAP_APPL40BSAPKH40B26
SAP_APPL45BSAPKH45B05
SAP_APPL45BSAPKH45B07
SAP_APPL45BSAPKH45B08
SAP_APPL46ASAPKH46A01
SAP_APPL46ASAPKH46A02
SAP_HR40BSAPKE40B21
SAP_HR40BSAPKE40B23
SAP_HR40BSAPKE40B26